




- 3BR, 2BA Home
- $2,750 Pricing
- 1,815 Square Feet
- Available Now Availability
Unit Rent and Fees
Unit Price
- $2,750
Schedule a Tour
About 8605 Ganttcrest Dr
Lovely single-single story home available for immediate move-in. You'll love the 10 foot ceilings, flexible floor plan with 2 dining areas, and the huge backyard! The formal dining room could be used as a playroom, office, or additional living room space. Cozy fireplace in the living room. The kitchen opens up to the 2nd dining area and features a breakfast bar, wood-like tile, and stainless steel appliances including a refrigerator and gas range. The primary bedroom includes a walk-in closet and ensuite full bath with dual sinks, a separate tub and walk-in shower. 2 additional bedrooms + 1 full bath. Laundry room leads to the 2-car attached garage. The large covered patio in the fully fenced backyard offers the perfect space to unwind or entertain outside. Google Fiber available. Great location with easy access to Mopac. A quick drive to Alamo Drafthouse, Oasthouse Kitchen + Bar, Orangetheory Fitness, barre3, and more! Apply via RentSpree: . MLS ID 3679366
8605 Ganttcrest Dr is located in the Western Oaks Neighborhood and 78749 Zip code of Austin, TX.
Property Contact Info
- Listed by:
- Agency:
- Vendor Logo:
- Website:
- View Property Website
- Call Us:
- (512) 653-1966
- Disclaimer:
Features and Amenities
On-Site Services
- Garden Style
Kitchen Amenities
- Microwave
- Refrigerator
- Disposal
- Dishwasher
Living Area Features
- Tile Floors
- Vinyl Flooring
- Carpet

Map
- Shopping
- Colleges
- Grocery
- Medical
- Parks
- Transportation

Map
Getting Around
40 / 100 Fairly walkable
30 / 100 Limited public transit
70 / 100 Moderately bikeable
80 / 100 Very car friendly
Getting to Know the Area
50 / 100 Restaurants
40 / 100 Cafes
40 / 100 Nightlife
40 / 100 Shopping
90 / 100 Parks
100 / 100 Noise Level
Frequently Asked Questions about 8605 Ganttcrest Dr
What type of rental is available at 8605 Ganttcrest Dr?
There is currently a 3 Bed 2 Bath Home for rent with 1,815 sq ft listed at 8605 Ganttcrest Dr. It is Available Now.
How much is the rent at 8605 Ganttcrest Dr?
The rental at 8605 Ganttcrest Dr is currently listed at $2,750.
What area of town is 8605 Ganttcrest Dr located in?
Located in the Western Oaks Neighborhood, 8605 Ganttcrest Dr is in the 78749 Zip Code of Austin, TX.
Nearby Schools
Small Middle School
Mills Elementary School
Bowie High School
About GreatSchools Data on ApartmentHomeLiving.com.
Points of Interest
Time and distance from 8605 Ganttcrest Dr.
Arts Museums and Landmarks
Big Box and Retail
Walgreens
Costco
Target
Colleges and Universities
University of St. Augustine for Health Sciences - Austin, TX Campus
Austin Community College - South Austin Campus
Groceries
Heb
H-E-B
Hospitals
Ascension Seton Southwest
Texas Star Recovery
Austin Oaks Hospital
Hotspots
Military Bases
Camp Mabry Military Reserve
Parks and Recreation
8605 Ganttcrest Dr has 5 parks within 7.6 miles, including Ladybird Johnson Wildflower Center, Barton Creek Green Belt, Umlauf Sculpture Garden, Barton Springs Pool, and Deep Eddy.
Restaurants and Dining
Shopping Centers
8605 Ganttcrest Dr has 5 shopping centers within 1.6 miles.
Transit Stations
Martin Luther King, Jr. Station-Capital MetroRail
Nearby Neighborhoods
Nearby Apartments
Rental Price Ranges in the Area
| Bedroom | Average Rent | Cheapest Rent | Highest Rent |
|---|---|---|---|
| Austin Studio Apartments | $1,282 | $568 | $5,053 |
| Austin 1 Bedroom Apartments | $1,467 | $500 | $10,000+ |
| Austin 2 Bedroom Apartments | $1,862 | $624 | $10,000+ |
| Austin 3 Bedroom Apartments | $2,223 | $695 | $10,000+ |
| Austin 4 Bedroom Apartments | $2,159 | $575 | $10,000+ |
| Austin 5 Bedroom Apartments | $3,558 | $845 | $10,000+ |
| Austin 6 Bedroom Apartments | $2,619 | $814 | $10,000+ |
Browse Top Apartments in Austin
By Price
By Community Type
- Austin Apartments for Rent by Owner
- Austin Apartments with Rent Specials
- Austin Top Rated Apartments
- Austin Corporate Apartments
- Austin Furnished Apartments
- Austin Gated Apartments
- Austin Loft Apartments
- Austin Low Income Apartments
- Austin Military Apartments
- New Austin Apartments
- Austin Senior Apartments
- Austin Short-term Apartments
- Austin Student Apartments
- Austin Apartments with Utilities Included
